
Work seems a bit slow on this Oregon build. It's a whole new design and concept to the homes we have built in the past. This is a 5 unit Town Home, and we have wall to wall with a firewall. They started off with a little crooked measuring, and at the 4th wall, it's off by 3 inches. In building that's a hard one to cover up. We have been having to re do a lot of work. So it seems that we are not making the progress we usually do in one week. But in 5 days work we did get up 6 outside walls, and the framing for 3 units inside. We also have the top story started and hope to get the flooring done and perhaps some 2nd story framing done before we leave next Saturday.
No comments:
Post a Comment